Pillars Loading at Bedded Deposit Mining



V.А. Trofimov, Doctor of Technical Sciences, Lead Researcher, asas_2001@mail.ru Yu.А. Filippov, Candidate of Technical Sciences, Senior Research Associate Institute of Problems of Subsoil Complex Development of Russian Academy of Sciences, Moscow, Russia

References:

1. Baklashov I.V. Deformirovanie i razrushenie porodnyh massivov (Deformation and Destruction of the Rock Masses). Moscow: Nedra, 1988. 270 p.
2. Benjavski Z. Upravlenie gornym davleniem (Management of the Rock Pressure). Moscow: Mir, 1990. 254 p.
3. Bronnikov D.M., Zamesov N.F., Bogdanov G.I. Razrabotka rud na bolshih glubinah (Development of Ores at Big Depths). Moscow: Nauka, 1989. 292 p.
4. Bok H. Vvedenie v mehaniku skalnyh porod (Introduction of Rocks to Mechanics). Moscow: Mir, 1983. 276 p.
5. Kuznecov S.V., Odincev V.N., Slonim M.Je., Trofimov V.A. Metodologija rascheta gornogo davlenija (Methodology of Rock Pressure Calculation). Moscow: Nauka, 1981. 103 p.
6. Metody opredelenija razmerov opornyh celikov i potolochin (Methods of Defining the Sizes of the Support Pillars and Cap Pillars). Moscow: Izd-vo AN SSSR, 1962. 200 p.
7. Sovremennye problemy mehaniki gornyh porod (Up-to-Date Problems of Rocks Mechanics.). Leningrad: Nauka, 1972. 335 p.
8. Petuhov I.M., Linkov A.M., Sidorov V.S., Zubkov V.V., Zubkova I.A., Kuznecov V.P., Krotov N.V., Grebenshhikov A.A., Hodyrev E.D., Tleuzhanov M.A., Mustafin M.G. Raschetnye metody v mehanike gornyh udarov i vybrosov: sprav. posobie (Calculation Methods of Rock Bursts and Outbursts in the Mechanics: Handbook). Moscow: Nedra, 1992. 256 p.
9. Kazikaev D.M. Geomehanicheskie processy pri sovmestnoj i povtornoj razrabotke rud (Geomechanical Processes at Joint and Repeated Development of Ores). Moscow: Nedra, 1981. 288 p.
10. Titov N.V., Turuk Ju.V. Gornyj informacionno-analiticheskij bjulleten = Mining Information and Analytical Bulletin. 2009. № 8. pp. 391–394.
11. Charkovskij K.I., Marochkin D.V., Svidetelev M.A. Gornyj informacionno-analiticheskij bjulleten = Mining Information and Analytical Bulletin. 2003. № 7. pp. 195–197.
12. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Gornyj vestnik = Mining Herald. 1995. № 4. pp. 12–21.
13. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Fiziko-tehnicheskie problemy razrabotki poleznyh iskopaemyh = Physical and Technical Problems of Minerals Development. 1995. № 5. pp. 3–16.
14. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Fiziko-tehnicheskie problemy razrabotki poleznyh iskopaemyh = Physical and Technical Problems of Minerals Development. 1997. № 5. pp. 3–13.
15. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Problemy mehaniki gornyh porod: tr. XI Ros. konf. po mehanike gornyh porod (Problems of Mechanics of Rocks: Works of XI Conference on Mechanics of Rocks). Saint-Petersburg: izd. Sankt-Peterburgskogo gosudarstvennogo arhitekturno-stroitelnogo universiteta, 1997. pp. 427–448.
16. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Fiziko-tehnicheskie problemy razrabotki poleznyh iskopaemyh = Physical and Technical Problems of Minerals Development. 1997. № 2. pp. 3–12.
17. Grigorev A.M. Gornyj informacionno-analiticheskij bjulleten = Mining Information and Analytical Bulletin. 2008. № 7. pp. 205–211.
18. Metodicheskie ukazanija po opredeleniju razmerov kamer i celikov pri podzemnoj razrabotke rud cvetnyh metallov (Methodical Instructions on Determination of Sizes of Workings and Pillars at the Underground Mining of Ores of Non-Ferrous Metals). Chita: VNIPIgorcvetmet, 1988. 126 p.
19. Metodicheskie ukazanija po raschetu celikov razlichnogo naznachenija dlja uslovij mestorozhdenij kombinata «Pechenganikel» (Methodical Instructions on Calculation of Pillars of Different Function for the Conditions of Fields of Pechenganikel Industrial Plant). Leningrad: VNIMI, 1966. 35 p.
20. Feklistov Ju.G., Golotvin A.D. Litosfera = Sial Zone of Earth. 2015. № 6. pp. 130–135.
21. Bakumenko S.V., Kuzmin S.V., Demehin D.N., Vlasenko D.S. Gornyj informacionno-analiticheskij bjulleten = Mining Information and Analytical Bulletin. 2015. № 7. pp. 11–16.
22. Kuznecov S.V. Fiziko-tehnicheskie problemy razrabotki poleznyh iskopaemyh = Physical and Technical Problems of Minerals Development. 1965. № 5. pp. 3–19.

DOI: 10.24000/0409-2961-2017-4-46-53
Year: 2017
Issue num: April
Keywords : pillar working layer loading on pillar stress in the pillar roof subsidence of the worked-out area numerical methods numerical modeling
Authors:
  • Trofimov V.А.
    Dr. Sci. (Eng.), Laboratory Head, asas_2001@mail.ru Institute of the Integrated Subsoil Development Problems Named after Academician N.V. Melnikov RAN (IPKON RAN), Moscow, Russia
  • Filippov Yu.А.
    Cand. Sci. (Eng.), Senior Research Assistant, filippov.yury@gmail.com IPCON RAN, Moscow, Russia