Assessment of Pillars Hazard on Dynamic Destruction in the Developed Space of the Salt Mines



B.V. Laptev, Dr. Sci. (Eng.), Senior Researcher, laptevbv@mail.ru STC «Industrial Safety» CJSC, Moscow, Russia

References:

1. Trubeckoj K.N., Bronnikov D.M., Kuznecov S.V., Trofimov V.A. Methodological basis of calculation of separation pillars and identification of the bump hazardous situations when developing blanket deposits. Gornyj vestnik = Mining Bulletin. 1995. № 4. pp. 12–21.
2. Petuhov I.M., Linkov A.M. Mehanika gornyh udarov i vybrosov (Mechanics of Rock Bumps and Outbursts). Moscow: Nedra, 1983. 175 p.
3. Glushko V.T., Vinogradov V.V. Razrushenie gornyh porod i prognozirovanie projavlenij gornogo davlenija (Destruction of Rocks and Forecasting of Manifestations of Rock Pressure). Moscow: Nedra, 1982. 193 p.
4. Laptev B.V. On the rock-bump hazard of the saliferous rocks at the Verkhnekamsk deposit. Bezopasnost truda v promyshlennosti = Occupational Safety in Industry. 2001. № 5. pp. 29–31.

DOI: 10.24000/0409-2961-2017-10-22-25
Year: 2017
Issue num: October
Keywords : brittle failure of rocks in the dynamic form mechanical natural parameters of rocks mine technical factors multiple-factor regressive analysis flushing of workings
Authors:
  • Laptev B.V.
    Dr. Sci. (Eng.), Senior Research Assistant, laptev.borislfptev@yandex.ru STC «Industrial Safety» CJSC, Moscow, Russia